Chapters
Deployment Planning
Configure the First Leaf Switch Pair
Deploy First VxRail Cluster
Expand to Multirack
Cisco Nexus External Switch Configuration Example
Deployment Planning
-
1Deployment Planning
-
2Minimum requirements
-
3Unsupported environments
-
4Unsupported features
-
5Production topology deployment options
-
6Uplink options
-
7External switches
-
8VLANs and IP addresses
-
9VxRail deployment settings - first cluster
-
10VxRail deployment settings - second cluster
-
11DNS server records - first cluster
-
12DNS server records - second cluster
Configure the First Leaf Switch Pair
-
1Configure the First Leaf Switch Pair
-
2Cabling
-
3Change the default passwords
-
4Configure leaf switch OOB management interfaces
-
5Enable SmartFabric
-
6Connect to SmartFabric Services UI
-
7Update fabric and switch names
-
8Create networks for first VxRail cluster
-
9Create server interface profiles for the first VxRail cluster
-
10Configure L2 uplinks to the external network
-
11Configure L3 routed uplinks to the external network
-
12Additional configuration steps for L3 uplinks
-
13Configure a jump host port
Deploy First VxRail Cluster
Expand to Multirack
-
1Expand to Multirack
-
2Expand SmartFabric and VxRail cluster to multirack
-
3Verify preferred leader setting before fabric expansion
-
4Change the default passwords
-
5Configure management settings for new switches
-
6Add switches to SmartFabric
-
7View new topology in the SFS UI
-
8Configure additional rack and switch names
-
9Set spine switches as preferred leaders
-
10Configure leaf switch addresses for L3 uplinks
-
11Add a VxRail node to the cluster