L3 uplinks to the external network can be moved from the leaf layer to the spine layer if desired. This section covers the migration process.
The following figure shows the existing L3 uplinks from the leafs to the external switches in purple. The new connections from the spines to the external network are shown in yellow. In this example, 40 GbE connections are used from the external switches to the SmartFabric switches.