The following figure shows the two storage networks needed to create a dual-link direct interconnect between two clustered nodes (also known as back-to-back). The numbered blue lines indicate the recommended cabling order, beginning with the network adapter in the lowest slot number (port 1). After cabling storage, connect all nodes, LOM/rNDC/OCP, and ports 1 and 2 to a management/VM network.
![Image of two-node dual-link direct cabling](/static/media/9198938f-8c47-5a0e-82d9-6db6a62cd3f7/DAM-6ec1dd45-8892-446e-b3b5-ced49ae3fcee/out/2NDualMesh=GUID-20E27A69-52BA-4252-A000-DDD868395F86=1=en-us=Low.png)