Before beginning the external Z9432F-ON FSE and MX8116n FEM deployment, ensure that the requirements and guidelines in this section are followed.
Configuration of Dell PowerSwitch Z9432F-ON with Cisco ACI makes the following assumptions:
- All MX7000 chassis and management modules are cabled correctly and in a multichassis management group.
- PowerEdge MX, PowerSwitches, and Cisco ACI platforms are in a healthy state.
- VLTi cables between Z9432F-ON switches have been connected and in a healthy state.