Home > Storage > PowerMax and VMAX > Storage Admin > Design Guide—VMware IaaS with Big Cloud Fabric on PowerEdge MX Servers and PowerMax Storage > Existing infrastructure requirements
Implementation of this Ready Stack requires that the following infrastructure elements be present in the existing data center:
Dell EMC recommends a 10/25 GbE or 40/100 GbE infrastructure. Additional components, such as Dell EMC Networking cables and transceivers, are required to uplink the Ready Stack to the network. The specific component requirements depend on your networking and uplink requirements.