Home > Edge > Manufacturing Edge > Guides > Dell Validated Design for Manufacturing Edge - Design Guide with Litmus > Litmus tasks
This section describes the test results for the Dell Validated Design (DVD) solution for High Availability (HA) and Disaster Recovery (DR). For these test cases, “DVD applications” refers to Litmus Edge, Litmus Edge Manager, and the Streaming Data Platform (SDP) from Dell.
The tests results detailed in the following sections are all obtained using a particular configuration:
The objective of this test is to show how Litmus Edge device configurations can be backed up for retention and recovery. They can be saved to a remote location and restored as needed.
The objective of this test is to evaluate Litmus Edge migration if an ESXi node shuts down due to hardware or other failures.
The objective of this test is to evaluate Litmus Edge Manager migration if an ESXi node shuts down due to hardware or other failures.
The objective of this test is to provide an overview of active availability for Litmus applications. The test demonstrates how a Litmus Edge instance can run uninterrupted while Litmus Edge VMs are migrated on-demand or under load-balancing policies.