The Ready Stack for Red Hat OpenShift Container Platform 4.6 design requires a minimum of four servers for a three-node cluster, with each node running as both a controller node and a compute node. A three-node cluster can be expanded to a five-node cluster if required. You can also expand the five-node cluster with more compute nodes at any time. The maximum configuration that the customized Dell Technologies deployment tools support is 210 servers.
This design guide uses a server-node base configuration for the PowerEdge R640 and PowerEdge R740xd server nodes that can be used in each node role. For compute nodes that require add-in devices such as GPUs, we strongly recommend PowerEdge R740xd servers. Appendix A shows the PowerEdge server baseline configurations that we used in the design. The following table shows the hardware configuration that is required to build the cluster design that we used for our validation work:
Table 8. Cluster configuration: Number of servers
Node name |
Quantity |
Configuration |
CSAH |
1 |
PowerEdge R640 server configuration |
Controller |
3 |
PowerEdge R640 server configuration |
Compute |
2 or more* |
PowerEdge R640 or R740xd server configuration |
*A three-node cluster does not require any compute nodes; however, to expand a three-node cluster with additional compute machines; you must first expand the cluster to a five-node cluster with two additional compute nodes.
The following table provides additional cluster configuration information:
Table 9. Cluster configuration: Reference information
Quantity* |
Description |
Dell Technologies reference |
1 |
Rack enclosure: APC AR3300 NetShelter SZ 42U |
|
1 |
Management switch: Dell EMC Networking S3048-ON |
|
2 |
Data switch: Dell EMC Networking S5248F-ON or Dell EMC Networking S5232-ON |
|
7-210 |
CSAH, Control-plane: Compute nodes: or Dell EMC PowerEdge R740xd |
or
|
2-4 |
Power distribution unit: APC metered rack PDU 17.2 kW |
*Rack enclosures and power distribution units are site-specific. Review the physical dimensions and power requirements in a site survey.