- In the NSX Manager web UI, go to .
- Next to Managed by, select the vCenter from the drop-down menu.
- Check the box next to the VxRail cluster and click CONFIGURE NSX.
- In the NSX Installation dialog box, select transport-node-profile from the drop-down menu and click APPLY.
NSX-T transport node configuration starts.Note: NSX-T configuration may take about six minutes for a four-node cluster.When complete, the NSX Configuration column shows Success and the Node Status shows Up for each host in the cluster.
Figure 27. Hosts configured for NSX-T Note: Since the host overlay VLAN, VLAN 2500, is not yet configured on the switches, the TEP IP addresses are not assigned by DHCP at this point.