Before initiating a switchover, a dry run can be used to estimate how long a switchover takes. A dry run is a simulation of a switchover. A dry run can be set up to run automatically or manually triggered as needed.
An Automatic dry run occurs when:
Figure 61. Automatic dry run
Setting up a manual dry run is the same as creating a slot for a switchover, but it needs to be marked as a dry run and have migration paths assigned to it.
To start a dry run, take the following:
1. Go to the Current event screen in the Switchover module and click the Start new event button as shown in the following figure: (If an event is running, click Close Event.)
Figure 62. Start a new event
2. Select Dry run from the Type dropdown list.
Figure 63. Select a dry run
3. Select a switchover group from the Group dropdown list. If you need to define a switchover group, choose Other in the dropdown. Enter the group name and select the migration path(s) then click OK.
4. When you click OK, the following view appears:
Figure 64. Current dry run
5. The results of the dry run are then available under the Pending groups screen as follows:
Figure 65. Pending group dry run results