Home > Storage > PowerStore > Virtualization and Cloud > Dell PowerStore: VMware Site Recovery Manager Best Practices > Recovery Plan Testing
When testing a recovery plan, the virtual machines will run on a test network and PowerStore does support creating read-write snapshots, allowing Site Recovery Manager to perform a test recovery with the Metro Volume devices.
A recovery operation will attempt a vMotion of the virtual machines in the stretched protection group/recovery plan. The following are two key points during recovery plan testing:
Note: TechSol Blue is a protected site and TechSol-Red is a recovery site. The test recovery will start the cross-vcenter migration workflow.
Note: The datastores were presented to the recovery host prior to the test recovery and vMotion is enabled. The recovery plan will hang on the step Prepare stretched storage if the storage is not presented in the recovery environment.